Ready to Install the Geomembrane

Original size is 800 × 533 pixels

Constructed as an additional water source supplying our newly developed pump house, the reservoir is now ready to be lined with a low permeability geomembrane. By investing significantly in water management, we strengthen our own reserves to supply the needs for the whole plantation at the lowest maintenance and environmental cost possible.